Students and professionals studying business, computer science and engineering, and fashion design at Mesa College will soon be doing so in a high-tech new building. Construction started on the $30-million structure in early summer, funded by the $1.5-billion propositions S and N construction bonds. A giant video display will anchor the entrance, while computer labs, classrooms, faculty offices, and a fashion design studio will fill the nearly 60,000-square-foot space.
Tags: Design, San Diego Mesa College, Tip Sheet